San Diego, CaliforniaCSLB C-10 License #1120701
(858) 585-5028estimating@lazaritelectric.com
Service · Panel & Meter Replacement

Electrical Panel & Meter Panel Replacement in San Diego

Lazarit Electric replaces outdated and unsafe electrical panels and meter panels, including Zinsco and Federal Pacific equipment, for apartment buildings, homes, and commercial properties across San Diego.

New Eaton meter stack installed by Lazarit Electric after replacing an outdated Zinsco meter panel in Chula Vista

When an electrical panel needs to be replaced

Many San Diego buildings still run on electrical panels and meter packs installed decades ago. Some brands, including Zinsco and Federal Pacific Electric (FPE), are widely considered a fire risk because their breakers can fail to trip during an overload or short circuit.

Insurance companies often flag these panels during inspections and may require replacement before they issue or renew a policy. Other common reasons to replace a panel include rust and water damage, overheating or burn marks, panels mounted on wood backboards, and service that is too small for the building's current load.

What we replace

  • Zinsco and Sylvania-Zinsco panels and meter packs
  • Federal Pacific (Stab-Lok) panels
  • Multifamily meter panels and meter stacks
  • Main service panels and main disconnects
  • Rusted, damaged, or overheating panelboards
  • Subpanels for units, ADUs, and additions

How a panel replacement works

  1. Site evaluation. We inspect the existing equipment, the service size, and the building's load.
  2. Written proposal. You receive a clear scope with what is included and not included.
  3. Coordination. We schedule the shutdown and coordinate the service disconnect and reconnect with SDG&E and the property owner.
  4. Installation. We remove the old equipment and install new, listed panels or meter stacks to current code.
  5. Inspection. The work is inspected and the new equipment is labeled before service is restored.

Recent panel replacement project

Outdated Zinsco meter panel at a Chula Vista apartment building before replacement Zinsco Meter Panel Replacement · Chula VistaAn apartment building's Zinsco meter panel failed insurance requirements and was replaced with a new Eaton meter stack and main disconnect. View the project →

Frequently asked questions

Is a Zinsco or Federal Pacific panel dangerous?

Both brands are widely considered a fire risk. Their breakers can fail to trip during an overload or short circuit, and older connections can overheat. A licensed electrician should evaluate any Zinsco or Federal Pacific equipment still in service.

Will my insurance company require a new panel?

Many insurance carriers flag Zinsco, Federal Pacific, and other outdated panels during inspections and may require replacement before issuing or renewing a policy. Replacing the equipment with new, listed panels resolves the issue.

Does a panel or meter replacement need SDG&E?

Yes. Replacing a main panel, meter panel, or meter stack requires a permit, an inspection, and coordination with SDG&E to disconnect and reconnect service.

Talk to Lazarit Electric

Send us your project details online, call (858) 585-5028, or email estimating@lazaritelectric.com.

Start Your Proposal Request