Project · Multifamily · Chula Vista, CA

Zinsco Meter Panel Replacement for an Apartment Building in Chula Vista

The building's insurance carrier flagged its original Zinsco meter panel as a fire hazard. Lazarit Electric removed the outdated equipment and installed a new Eaton meter stack and main disconnect, bringing the electrical service up to current code.

Old rusted Zinsco meter panel with seven meters mounted on a wood backboard inside a wooden cabinet at a Chula Vista apartment building, before replacement
BeforeOriginal Zinsco meter packs and a rusted safety switch on a wood backboard.
New Eaton multifamily meter stack and main disconnect with wireway and steel conduit installed on a Chula Vista apartment building after Zinsco panel replacement
AfterNew Eaton meter stack, main disconnect, and wireway, with the wall patched and finished.

Why the Zinsco panel had to go

Zinsco electrical panels and meter packs were common in Southern California buildings from the 1950s through the 1970s. Over time their breakers can fail to trip during an overload or short circuit, and the connections to the bus bars can loosen and overheat. That is why many insurance companies treat Zinsco equipment as a fire risk and require it to be replaced.

At this Chula Vista apartment building, the meter panel serving six units and the house meter was still the original Zinsco equipment. It was mounted on a wood backboard inside a wooden cabinet, the steel enclosures were rusted, and the service no longer met the property's insurance requirements.

What Lazarit Electric installed

  • Removed the Zinsco meter packs, the old safety switch, and the wood backboard and cabinet
  • Installed new Eaton multifamily meter stacks for six apartment units and the house meter
  • Installed a new Eaton main service disconnect
  • Added a wireway and steel conduit for clean, protected conductor routing
  • Installed waterproof flashing membrane behind the new equipment before the wall was patched
  • Labeled the new meter positions and service equipment

The result

The building now has a modern, surface-mounted electrical service with new listed equipment and no combustible backboard behind it. The new installation addresses the insurance carrier's concern and gives the owner a safer, more reliable service for every unit.

Project photos

Learn more about our electrical panel and meter replacement services and multifamily electrical work.

Frequently asked questions

Is a Zinsco panel a fire hazard?

Zinsco panels and meter packs are widely considered a fire risk. Their breakers can fail to trip during an overload or short circuit, and aging bus bar connections can overheat. A licensed electrician should evaluate any Zinsco equipment still in service.

Will my insurance company accept a Zinsco panel?

Many insurance carriers flag Zinsco and other outdated electrical panels during inspections and may require replacement before issuing or renewing a policy. Replacing the equipment with new, listed panels resolves the issue.

Does a meter panel replacement require SDG&E?

Yes. Replacing a meter panel or meter stack requires a permit, inspection, and coordination with SDG&E to disconnect and reconnect service. Lazarit Electric manages the electrical work and coordinates the process with the property owner.